Storage Mezzanine Floor for Warehouse Premises in Staffordshire

The Problem:

Haywood Contracts in Staffordshire had outgrown their existing premises and would have to take on a larger unit to cope with demand if they didn’t solve their storage issue.

The Solution:

After submitting a competitive quotation, TDI was awarded the contract to supply & install a storage mezzanine floor. This meant that Haywood could retain the ground floor for production with the headroom above used for storage of stock.

The Outcome:

A simple yet cost-effective way of utilising the wasted space in a typical warehouse environment gave our client that much-needed storage space without comprising their ground floor operations. They now have a storage mezzanine floor that meets all of their business needs.

Get a Quote

Project Details:
Do you require?

Make an enquiry